To renovate a 65-year-old water reservoir, Structural Steel was utilized to replace the outdated concrete roof with a modern Structural steel framed roof.
Steel Ton – 35 Tonne
The project faced challenges such as strict time constraints to ensure the reservoir could be commissioned promptly, as well as the need for meticulous handling and erection of the steelwork due to the high-level coating systems involved in the process.